START YOUR PROJECT
SIPENG CNC logo SIPENG CNCExpert in Advanced Manufacturing
Home / Company / Quality Control

Quality Control

Inspection scope, acceptance criteria and documentation are defined according to the machine type, application and agreed project requirements.

Quality Assurance

Quality Verified to Agreed Project Requirements

Quality control is coordinated throughout the project, including applicable incoming‑component checks, assembly verification, functional testing, sample machining and final inspection. The exact inspection scope, acceptance criteria and documentation are defined according to the technical agreement and customer requirements.

Quality Control Process
Incoming Component Inspection
01 Incoming Component Inspection

Brand, model, specification and appearance of key purchased components are checked to confirm they meet the project technical requirements.

Assembly & In‑Process Control
02 Assembly & In‑Process Control

Assembly accuracy, alignment, fastening condition and key processes are checked during assembly and production.

Machine Geometry Verification
03 Machine Geometry Verification

Spindle accuracy, geometric accuracy, squareness, parallelism and related items are checked according to machine type and project requirements.

Function, Safety & Automation Testing
04 Function, Safety & Automation Testing

Main machine functions, safety interlocks, PLC control, feeding mechanisms and automation systems are tested.

Sample Machining & Part Inspection
05 Sample Machining & Part Inspection

Where the project requires, test pieces or customer parts are machined to verify dimensions, surface quality, cycle time and running stability.

FAT & Final Acceptance Documentation
06 FAT & Final Acceptance Documentation

Factory Acceptance Test (FAT) is carried out according to the mutually confirmed technical agreement or acceptance criteria, and the technical documentation agreed for the project is prepared. FAT scope, test items, acceptance criteria and required documentation are defined according to the machine configuration and the requirements agreed with the customer.

Quality Assurance

What We Verify

  • Critical component specifications
  • Assembly accuracy and alignment
  • Machine geometry and spindle condition
  • Positioning accuracy and repeatability, when required
  • Machine functions and safety interlocks
  • PLC functions, feeding systems and automation performance
  • Sample-part dimensions and surface finish
  • Cycle time and process stability, when specified

Verification items are selected according to the machine configuration, application, technical agreement and customer requirements.

Documentation

Quality Records & Project Documentation

Inspection records and technical documentation are prepared according to the machine type, project scope, technical agreement and customer requirements.

Depending on the machine type and agreed project scope, available documentation may include:

  • Machine Geometry Inspection Record
  • Spindle Accuracy and Runout Record
  • Positioning Accuracy and Repeatability Record
  • Sample-Part Inspection Report
  • FAT Checklist & Acceptance Record
  • Applicable Electrical Diagrams, Manuals & Agreed Backup Files

The final documentation package is defined according to the agreed project scope. Available records vary by machine type, configuration, application and customer requirements.

HAVE A PART TO PRODUCE?
LET'S BUILD THE RIGHT SOLUTION.

Send us your part drawing, material, tolerance and production requirements. Our team will evaluate the application and recommend the right machine, process and automation configuration.

SEND YOUR PART DRAWING

Share your part and production requirements. Our team will review the application and recommend the next step.

Drawing upload (optional) — supported: PDF, STEP, STP, IGES, DWG, DXF, JPG, PNG, ZIP, DOC, XLS · up to 50MB