Prestressed Anchorage Wedge External Taper Machining Automation Case Study

An elevating feeder and dual-channel CNC lathe were added to automate handling for prestressed anchorage wedge turning. The customer reports about 20 seconds per part in the original process and about 14 seconds in the new process; the time scope and production results should be verified on a consistent basis.

Prestressed Anchorage Wedge External Taper Machining Automation Case Study


Prestressed Anchorage Wedge External Taper Machining Automation Case Study

SIPENG CNC  |  Engineering Application Case

This project addresses external-taper turning, an external circumferential groove and a chamfer at the small-end bore of a prestressed anchorage wedge blank. The existing process already completed these operations in one setup. The improvement added automatic feeding and a dual-channel CNC lathe to reduce manual part handling and organize continuous production. The customer reports that the machining time per part fell from about 20 seconds to about 14 seconds. Commissioning also showed that bore consistency and machining allowance in the incoming blanks directly affect feeding, clamping and stable cutting.

Part and Machining Scope

The component is used in prestressed anchorage applications, including bridges, high-rise buildings and mining. This case covers the turning operations only. Completion of this turning stage does not mean that the wedge is fully manufactured or that anchorage performance has been accepted.

The turning scope includes the external taper and associated outside-diameter surfaces, an external circumferential groove, and a chamfer at the small-end bore. The source material calls the groove a “retaining-ring groove”; its actual function and dimensions must be confirmed from the customer drawing. The drawing should define the taper angle, diameters, effective length, surface finish and datum relationship to the bore.

The source lists 40Cr and “45CrMo” among the alloy-steel materials. The exact grade and governing standard for “45CrMo” remain unconfirmed and should be checked against the customer’s material certificate. Material condition, hardness and any subsequent heat-treatment requirements should also be confirmed from the drawing and purchasing specification.

 

Figure 1. Incoming wedge blank

 

Figure 2. Wedge after turning

 

Figure 3. Prestressed anchorage application

Original Process and Main Constraints

The original process used 0640 CNC lathes, with one operator tending three machines and loading and unloading each part manually. The part was completed in one setup for this turning stage, and the customer reported a cycle time of about 20 seconds. Since the original process already completed the operations in one setup, the improvement focused on reducing manual loading and unloading, reorganizing production and increasing the potential for continuous operation.

Some blanks have an outside diameter 3–4 mm larger than the target diameter. If this is the diameter difference at the same cross-section, the corresponding radial stock is about 1.5–2 mm. For a tapered blank, the stock should be checked at several sections; the stated difference should not be treated as the cutting depth everywhere. Larger stock increases the volume to remove, cutting load and chip-evacuation demand.

The customer reported a high volume of chips and cases of chips wrapping around the workpiece and tool. Process improvement should review blank allowance, insert chipbreaker geometry, feed, depth of cut, coolant delivery and chip evacuation together. Increasing spindle speed alone is not a reliable remedy, and chip wrapping should not be attributed solely to excessive stock without checking the other conditions.

 

Figure 4. 0640 CNC lathe used in the original process

 

Figure 5. Internal expanding workholding fixture

 

Figure 6. Original machining area and workholding arrangement

For internal expanding workholding, confirm the incoming-bore size range, effective contact length and workpiece position after expansion. Commissioning should verify both slip resistance and the risk of workpiece distortion, as well as axial location and the actual relationship between the external taper and bore. A fixture photograph does not replace setup-accuracy records.

Automatic Feeding and Dual-Channel Machining

The project added an elevating feeder so operators can replenish a batch of blanks while the machine feeds and unloads parts automatically. Blanks are lifted, oriented and transferred into the machine; finished parts are discharged automatically. The feed direction and recovery actions for a missing or jammed blank should be confirmed against the installed mechanism and control program.

The source describes the feeder as providing “automatic recognition” but does not identify how recognition is performed. This case therefore describes the function as automatic part orientation and feeding. It does not claim that the machine includes vision recognition or in-process dimensional inspection.

 

Figure 7. Elevating automatic feeder

 

Figure 8. CNC lathe in the new process

The dual-channel configuration organizes the corresponding turret and machining actions. The channel sequence, interlocks and tool-clearance envelope must be defined to prevent interference. Whether both channels cut simultaneously and how operations are assigned must be confirmed from the actual machine configuration, program and commissioning records; the name “dual-channel” alone does not establish the source of any cycle-time improvement.

The process plan should still define workholding, the allocation of roughing and finishing, groove and chamfer operations, cutting data and retract paths for the part. Auxiliary motions and cutting time should be reduced only after clamping and chip evacuation are stable.

 

Figure 9. Machining area of the new process


Commissioning Findings and Blank Selection

During early commissioning with hot-forged blanks, the customer reported inconsistent bore roundness and size, unreliable feeding and selection, slipping after clamping, and limits on turning speed. These observations indicate that the tested blanks were not adequately matched to the installed feeder, fixture and cutting conditions. They should be investigated individually rather than addressed only by increasing clamping force.

With bore-based location or expansion clamping, bore variation may lead to uneven contact, positional shift or reduced effective clamping capacity. The specific cause should be verified by measuring the bore, checking contact conditions and making trial cuts. Before increasing expansion or clamping pressure, confirm the allowable workpiece distortion and fixture limits.

After several rounds of testing, the project selected cold-forged blanks as the production input for the current setup. This finding applies to the blanks, fixture and cutting conditions tested in this project. It does not mean that hot-forged blanks are generally unsuitable for machining or that every cold-forged blank can be fed automatically without qualification.

Incoming Blank Conditions for Sustained Production

Purchasing specifications should define material and hardness, bore size and form variation, overall profile and length range, machining allowance at multiple sections, burrs and surface condition. The blank must meet the feeder path, fixture clamping range and tool-load requirements. Representative lots should be trialed before release to production.

Feeder acceptance should record jams, incorrectly oriented blanks and missed feeds. Workholding acceptance should record slip and post-machining deviations. Cutting validation should check chip wrapping, tool wear and continuous-running behavior. These are proposed validation records; they do not imply that all of these inspection functions are built into the machine.

Machining Time and Output Comparison

The customer reports about 20 seconds per part for the original process and about 14 seconds for the new process. Compare these figures over the same sequence of actions and state whether loading, clamping, cutting, unclamping and unloading are included. The available information does not include a complete motion-time breakdown, so the calculations below do not establish actual shift output.

Based on 20 seconds versus 14 seconds, the time per part is 30% shorter. If both figures use the same measurement scope and the machine runs continuously, the theoretical output rate is about 42.9% higher. These percentages describe different measures; a 30% reduction in time should not be reported as a 30% increase in output.

The table uses uninterrupted production with no downtime or rejected parts. Actual good-part output must account for replenishment, tool changes, chip clearing, faults, inspection and scrap. Automatic feeding can reduce one-by-one handling, but changes to the number of machines tended by one operator and to labor cost still require shop-floor records.


Measure

Original process

New process

Loading and unloading

Manual, one part at a time

Batch replenishment followed by automatic feeding and discharge

Machine configuration

0640 CNC lathe

Dual-channel CNC lathe

Staffing

1 operator tending 3 machines

No measured machine-tending ratio provided

Customer-reported time per part

About 20 s

About 14 s

Theoretical output per hour

180 parts per machine

About 257 parts per machine

Theoretical output per 8-hour shift

1,440 parts per machine

About 2,057 parts per machine

 

Project Conclusion and Items to Verify Before Publication

The engineering value of this case lies in matching the incoming blank, feeding system, workholding and turning process as one production system. The current setup uses cold-forged blanks qualified through trials, automatic feeding and a dual-channel CNC lathe. The customer reports a shorter time per part. Process stability and cost benefits still need to be verified with continuous-production records.

Before external publication, confirm the “45CrMo” material designation, the action scope included in the 20-second and 14-second figures, the drawing and acceptance results for the taper, groove and chamfer, and the approved incoming-blank range and actual good-part shift output. The source provides no tolerance, yield, tool-life or cost data, so none are stated here. Final machine configuration, dimensions and machining quality should be supported by the drawing, physical samples and inspection records.

Other Solutions

SUS306L Gate Valve Stem Tapered Square Machining
SUS306L Gate Valve Stem Tapered Square Machining

A CNC squaring machine with a dedicated clamping sub-sleeve, spindle taper support and indexable tooling cut the tapered-square cycle on SUS306L gate valve stems from about 3 minutes to 1 minute 20 seconds per piece, with one operator now covering three machines.

View solution →
Case Study on the Machining of Copper Rotor Bars for Submersible Pump Motors
Case Study on the Machining of Copper Rotor Bars for Submersible Pump Motors

SIPENG CNC developed an automatic CNC turning solution for machining both ends of copper rotor bars used in submersible pump motors. The solution combines dedicated feeding, workholding and internal guidance to improve production output, machining consistency and handling of long copper profiles.

View solution →
Case Study on the Machining of Copper End Rings for Submersible Pump Motor Rotors
Case Study on the Machining of Copper End Rings for Submersible Pump Motor Rotors

SIPENG CNC developed a drilling and chamfering solution for copper end rings used in submersible pump motor rotors, combining CNC machining, through-spindle coolant and dedicated fixtures to address chip wrapping, manual clamping and repetitive handling.

View solution →
Submersible Pump Motor Rotor Assembly Outer Diameter Machining Case Study
Submersible Pump Motor Rotor Assembly Outer Diameter Machining Case Study

To address issues such as tool switching, repeated alignment, and handling-induced damage during the machining of the outer diameter of submersible pump motor rotor assemblies, this case study reconfigures the machine tool, internal bore clamping method, and workpiece handling process, enabling continuous external turning in a single setup while protecting the machined surfaces.

View solution →
Bicycle Bottom Bracket Spindle End Machining Automation Case Study
Bicycle Bottom Bracket Spindle End Machining Automation Case Study

A pipe fitting manufacturer replaced scattered manual lathes with a cell of CNC lathes fed by bar feeders. Process planning, tooling packages, part programs and operator training were delivered with the machines, so fitting blanks now move through the cell on a fixed, repeatable route.

View solution →
Integrated Bicycle Disc Brake Rotor Internal Thread Machining
Integrated Bicycle Disc Brake Rotor Internal Thread Machining

CNC turning case study for a one-piece bicycle disc brake rotor. A dedicated fixture supports the perforated rotor web, approximately 1.8 mm thick, during internal-thread and face machining in one setup. The customer reports an 18-second cycle time; the timing scope and dimensional basis require confirmation.

View solution →
Automated Feeding and Turning for a Shock Absorber Locating Sleeve
Automated Feeding and Turning for a Shock Absorber Locating Sleeve

An automatic feeding system was integrated with a CNC lathe to machine deep-drawn shock absorber locating sleeves. The original turning process already used one setup but required manual loading and unloading. The customer reports a change from about 10 to 7 seconds per part and one operator tending four to six machines; production conditions should be verified.

View solution →
Automated Turning of Automotive Welding Locating Pins
Automated Turning of Automotive Welding Locating Pins

Precision machining solutions for titanium and aerospace aluminum components with complex geometries and demanding tolerances.

View solution →

Frequently Asked Questions

I can provide drawings, material and blank specifications. Can you recommend the right machine and machining route?
Yes — that is exactly how we start. Send the drawing (PDF, DWG or STEP), material grade, blank dimensions, key tolerances and your target output. Our engineers review the part geometry and process, then recommend a machine model, fixture concept and machining route, together with an estimated cycle time. We reply with a written evaluation and quotation within 24 hours.
Can my part be completed in one setup? Which operations would need other equipment?
It depends on geometry, size and accuracy, so we answer this per part, not in general. After reviewing your drawing we reply in writing: which operations are completed in one clamping, which need a second operation or a different machine, and what the recommended process chain looks like. If a part genuinely needs two setups, we say so instead of promising one-setup results.
Are cutting tools, fixtures, bar feeder and CNC programs included?
They can all be included — the delivery scope is defined line by line in our quotation. A typical turnkey package covers the machine, fixtures designed for your parts, the tooling package, bar feeder integration and CAM programs for your parts, plus a recommended consumables list. If you prefer machine only, or want to keep your existing tooling, the scope is adjusted and every included and excluded item is listed before you sign.
How do you evaluate the machining time for my parts?
We build the process route first, then calculate cycle time from tool paths and cutting data, and cross-check it with CAM simulation. The estimated time per part is stated in the proposal. During trial cutting the actual cycle time is measured; the measured result — not the paper estimate — is the basis for acceptance, so the number you plan production around is a verified one.
Can you run trial cutting with my own material?
Yes, and we recommend it. You send material or blanks; after the machine, fixtures and programs are ready we machine your parts, record cutting parameters, cycle time and tool behaviour, and provide a trial report with measurement results, photos and video. The trial schedule is agreed with you in advance, so you can attend in person or follow it remotely.

HAVE A PART TO PRODUCE?
LET'S BUILD THE RIGHT SOLUTION.

Send us your part drawing, material, tolerance and production requirements. Our team will evaluate the application and recommend the right machine, process and automation configuration.

SEND YOUR PART DRAWING

Share your part and production requirements. Our team will review the application and recommend the next step.

Drawing upload (optional) — supported: PDF, STEP, STP, IGES, DWG, DXF, JPG, PNG, ZIP, DOC, XLS · up to 50MB